welding
adhesive tape
flat
When welding the valve and the pipes, use the wet cloth to cool down the valve
and the pipes.
The refrigerant pipe should be clean. The nitrogen should flow under the pressure of about 0.02Mpa
and when charging the nitrogen, stop up the end of the pipe by hand to enhance the pressure in the
pipe, then loose the hand (meanwhile stop up the other end).
source valve
1st side
2nd side
hand
0.02MPa
3. Leakage testing
Charge nitrogen(to test the leakage condition)
To prevent the nitrogen into outdoor system, charge nitrogen to the indoor respectively. Connect the
connection pipe to checking joint of the indoor gas pipe stop valve, and seal all the other joints except
for outdoor's, charge the nitrogen, the gas pressure should be 40Kf/cm2.
1) The outdoor unit has been executed the leakage test in the factory. After connecting the distributing
pipe, execute the leakage test from the outdoor check valve and the indoor. Besides, while testing, the
valves should be close.
2) Refer to the below figure to charge the nitrogen into the unit to take a test. Never use the chlorin,
oxygen, flammable gas in the leakage test. Apply pressure both on the gas pipe and the liquid pipe.
3) Apply the pressure step by step to the target pressure.
a. Apply the pressure to 0.5MPa for more than 5 minutes, confirm if pressure goes down.
b. Apply the pressure to 1.5MPa for more than 5 minutes, confirm if pressure goes down.
c. Apply the pressure to the target pressure (4.05MPa), record the temp. and the pressure.
d. Leave it at 4.05MPa for over 1 day, if pressure does not go down, the test is passed. Meanwhile,
when the temp. changes for 1degree, pressure will change 0.01MPa as well. Correct the pressure.
Protect the pipe end against the water, impurity into the pipes (welding after being flat, or being sealed
with adhesive tape).
When connecting the pipes, close the valves fully.
280
Summary of Contents for YCV280
Page 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Page 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Page 13: ...This range it 13...
Page 18: ...18...
Page 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Page 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Page 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Page 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Page 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Page 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Page 178: ...Installation 8 178...
Page 179: ...179...
Page 180: ...HAV018 24 HAV007 16 180...
Page 181: ...181...
Page 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Page 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Page 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Page 206: ...206...
Page 208: ...208...
Page 209: ...209...
Page 210: ...210...
Page 211: ...211...
Page 212: ...212...
Page 249: ...E Capacity compensation value at different piping length and drop 255...
Page 280: ...286...
Page 298: ...RWV02 FlowLogic 304...
Page 309: ...Installation and connections Dimensions Connecting board 315...
Page 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Page 322: ...Next Next Next 328...
Page 325: ...Select system DNS Click and add 331...
Page 327: ...3 Software installation Next 333...
Page 331: ...337...