e. After confirmation of a~d, if pressure goes down, there is leakage. Check the brazing position, flared
position by laying on the soap. modify the leakage point and take another leakage test.
4) After leakage test, must execute the evacuation.
gauge manifold
Lo
Hi
Lo handle
Hi handle
Operation procedure:
Evacute at the check valve of liquid stop valve and both sides of the gas stop valve. The oil
equalization pipe also must be vacuum (executed at the oil equalization pipe check valve
respectively).
leakage test passed
evacuation begins
evacuation ends
check vacuum
charge refrigerant
after reaching -101KPa or less
(below -755mmHg), let the
vacuum pump running
continuously for over 1hour.
leave it for over 1
hour, vacuum
pointer does not
arise.
if vacuum pointer arises, it shows there is water or leakage in the
system, please check and modify it, and then evacuate again.
To prevent the different oil into the pipe, please use the special tool for R410A, especially for
gauge manifold and charging hose.
To prevent the compressor oil into the refrigerant cycle, please use the anti-counter-flow
adapter.
When maintaining the outdoor, release refrigerant from check valve. When taking vacuum
evacuation, set the relative dip switch, the detailed refers to Page 38.
Because the unit is with refrigerant R410A, the below issues should be paid attention:
. Evacuation
4
281
Summary of Contents for YCV280
Page 1: ...Design Installation and Maintenance instruction R410A Heat Pump 50 Hz FlowLogic II 2016...
Page 5: ...2 External appearance YCV280 Outdoor YCV335 YCV400 YCV450 5...
Page 13: ...This range it 13...
Page 18: ...18...
Page 34: ...4 Piping diagram liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 34...
Page 62: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 62...
Page 83: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 83...
Page 135: ...AQXQVO LQIOZIU fckoc jcj_ a m jcj_ FFV cfn_l cfn_l h ch iil b_ n _r b ha_l 135...
Page 170: ...C 938 1046 186 5 234 2 6 5 2 9 9 A B MODEL 3 Dimensions HAV007 16 HAV018 24 170...
Page 171: ...4 Piping diagrams liquid pipe gas pipe EEV filter filter fan indoor heat exchanger 171...
Page 178: ...Installation 8 178...
Page 179: ...179...
Page 180: ...HAV018 24 HAV007 16 180...
Page 181: ...181...
Page 185: ...9QTMUZQVUZ 86 97 6 96 8 786 8MU MY VN OYI Q 185...
Page 186: ...0 CQWQUO LQIOYITZ hemqe lela c o lela GGX behpan behpan b j ej kkn da p at_d jcan 186...
Page 200: ...N PR 6 MkjZeeh Sd_ji 62A B yt F vwv 200...
Page 206: ...206...
Page 208: ...208...
Page 209: ...209...
Page 210: ...210...
Page 211: ...211...
Page 212: ...212...
Page 249: ...E Capacity compensation value at different piping length and drop 255...
Page 280: ...286...
Page 298: ...RWV02 FlowLogic 304...
Page 309: ...Installation and connections Dimensions Connecting board 315...
Page 315: ...Ports Each port have serial number like 1 2 3 8 System Brief 321...
Page 322: ...Next Next Next 328...
Page 325: ...Select system DNS Click and add 331...
Page 327: ...3 Software installation Next 333...
Page 331: ...337...