Printed Documentation
20
AS4000 AC Rack Cabling and Wiring
AC Rack E1 Cabling 75 ohm
Access Concentrator Interface Panel
All cabling to the access concentrator connects to the interface panel. Slots 4,5 and 6 can be
used for 75ohm and 120ohm connections. Slots 7-14 is used for 120ohm connections each
slot will support up to 8 E1 connections.
Access Concentrator Interface Panel (1026 Board)
Specification
: In installations with 75ohm cabling Braided screened, 75ohm, Coaxial Cable
is to be used for interconnection between the AC shelf the DDF and switch/channel bank.
a) E1 Cabling (CT Link)
From the site survey, confirm the location of the Digital Distribution Frame (DDF) if a DDF is
to be used or the CT links if the E1 feeds are fed direct to the equipment. The length of E1
feeds should not exceed 100 metres.
Note: This must be a SELV port of an EN 60950 approved product.
Run the E1 cables from the AC shelf to the allocated positions on the DDF. (8 cables per CTU
in normal working,up to 3 CTUs per shelf.).
In partial equipped installations it may be appropriate to run enough cables to cater for a
complete rack of equipment. This reduces the need to disturb original installation when
adding additional equipment.
Feed the E1 cables through the top hole on the left hand side of rack side of the rack, and
down the channel at the side of the rack.
Identify and label each cable at both ends as well as the DDF/Backhaul positions.
Terminate all cables with BNC co-axial connectors (or it is possible to fit type 43 and adapters
if BNC connectors are not available).
Summary of Contents for AS4000
Page 2: ......
Page 6: ...Printed Documentation 2 ...
Page 14: ...Printed Documentation 10 ...
Page 16: ...Printed Documentation 12 ...
Page 27: ...Installation 23 Typical 75ohm DDF Layout ...
Page 28: ...Printed Documentation 24 ...
Page 41: ...Installation 37 ...
Page 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Page 43: ...Installation 39 Type 43 Terminations to Coax ...
Page 44: ...Printed Documentation 40 ...
Page 52: ...Printed Documentation 48 ...
Page 68: ...Printed Documentation 64 ...
Page 71: ...Installation 67 ...
Page 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Page 73: ...Installation 69 BNC Terminations to Coax ...
Page 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Page 75: ...Installation 71 ...
Page 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Page 110: ...Printed Documentation 106 ...
Page 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Page 133: ...Setup and Test 129 ...
Page 163: ...Setup and Test 159 ...
Page 166: ......
Page 170: ...Printed Documentation 166 ...
Page 176: ...Printed Documentation 172 ...
Page 192: ......