d. 3 CTUs are supported. Each CTU supports four CT modem shelves. Each CTU
may be cabled for four 120
E1s or four 75
E1s. and are placed in slots 4, 5,
and 6
e. XTUs (CAS, Data, ISDN, V5.1, V5.2 and PTU) are supported. Each XTU may be
cabled for eight 120
E1s. These can be placed in slots 5-14.(It is preferable to
build from slot 7 leaving 5 and 6 available for additional CTUs if required)
f.
CU cards may go in any unused slot. (slots 15& 16 are preferred as they have no
E1 connections.
g. RTU card can go in slot 9
or
17 for card redundancy using a spare TU8 card (not
PTU), the redundant card is selected via Sitespan.
Note
If installing a PTU the D-type on the backplane must be fitted with a D-Type to RJ45
adapter. The RJ45 to DB25 connector currently must be connected onto the lower of the two
25-way AC connectors (even though the activity lights work if connected to the top).
The preferred E1 options are shown below
Card Insertion T1 Systems
Insert the cards into the shelves, recording the serial numbers and revision status in the test
results form. The actual cards provided will depend upon the customer configuration.
a) The load sharing PSUs go in slots 1&2.
b) The Shelf Controller goes in slot 3.
Summary of Contents for AS4000
Page 2: ......
Page 6: ...Printed Documentation 2 ...
Page 14: ...Printed Documentation 10 ...
Page 16: ...Printed Documentation 12 ...
Page 27: ...Installation 23 Typical 75ohm DDF Layout ...
Page 28: ...Printed Documentation 24 ...
Page 41: ...Installation 37 ...
Page 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Page 43: ...Installation 39 Type 43 Terminations to Coax ...
Page 44: ...Printed Documentation 40 ...
Page 52: ...Printed Documentation 48 ...
Page 68: ...Printed Documentation 64 ...
Page 71: ...Installation 67 ...
Page 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Page 73: ...Installation 69 BNC Terminations to Coax ...
Page 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Page 75: ...Installation 71 ...
Page 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Page 110: ...Printed Documentation 106 ...
Page 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Page 133: ...Setup and Test 129 ...
Page 163: ...Setup and Test 159 ...
Page 166: ......
Page 170: ...Printed Documentation 166 ...
Page 176: ...Printed Documentation 172 ...
Page 192: ......