AS4000 AC Setup and Test
Access Concentrator: Turn-Up and DC measurements
Pre-Checks
Before commencing the turn-up of the rack check that the serial number and Rev levels of all
card have been entered into the test form and that the SC boot chip version is recorded.
DO NOT power up or plug any cards fully into their slots at this stage.
Router Port Availability. If the Sitespan Server is located at the NMC and connected via a
router confirm the IP address for the router at the AC and the port for connection (typically a
RJ45 cabled to the AC from the back of the router.
Apply a loopback on the designated router port (pins 3 to 6 on an RJ45).
Check that the router at the AC can be pinged and the loopback seen from the Sitespan
Server PC at the NMC by using a simple communication application as hyper terminal at the
COM port intended for Sitespan use.
Isolate all E1/T1 cables from the AC by removing the links at the DDF.
Disconnect all cards from the backplane by pulling forward in the card guides so that the
power will not be applied to the cards when the shelf is switched on.
Rack Turn-Up and Measuring Input Voltage (Test 1a)
This section describes the procedure for measuring and connecting DC to the rack, checking
that the cards have the correct alarm indications on power-up and measuring the PSU output
voltages.
Unscrew retaining screws on the face of the Fuse and Alarm Panel. Hinge forward the panel
and using the DMM measure and record the Exchange DC voltage supply across the input
terminals (TB1(-); TB2+;.for Supply 1 and TB4(-); TB5(+) for supply 2). Check that the polarity
is correct. Ensure that the voltage measured complies with the site nominal voltage and is
within the limits specified on the test results sheet.
Test Voltage
Record the measured voltage on the test results sheet.
3. Turn-Up AC Shelves: (Tests 1b)
Summary of Contents for AS4000
Page 2: ......
Page 6: ...Printed Documentation 2 ...
Page 14: ...Printed Documentation 10 ...
Page 16: ...Printed Documentation 12 ...
Page 27: ...Installation 23 Typical 75ohm DDF Layout ...
Page 28: ...Printed Documentation 24 ...
Page 41: ...Installation 37 ...
Page 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Page 43: ...Installation 39 Type 43 Terminations to Coax ...
Page 44: ...Printed Documentation 40 ...
Page 52: ...Printed Documentation 48 ...
Page 68: ...Printed Documentation 64 ...
Page 71: ...Installation 67 ...
Page 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Page 73: ...Installation 69 BNC Terminations to Coax ...
Page 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Page 75: ...Installation 71 ...
Page 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Page 110: ...Printed Documentation 106 ...
Page 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Page 133: ...Setup and Test 129 ...
Page 163: ...Setup and Test 159 ...
Page 166: ......
Page 170: ...Printed Documentation 166 ...
Page 176: ...Printed Documentation 172 ...
Page 192: ......