Installation
Mini Med Series
0000061122
Operational Checklist
l) Close drain valves.
2) Remove racks.
3) Partially fill tanks with warm water.
4) Replace racks.
5) Plug in processor, apply Power.
6) Inspect transport drive system.
7) Check recirculation plumbing for leaks.
8) Top off tanks using Manual Replenishment switch.
9) Check Film Feed switch and “Beeper” operation.
10) Check temperature control systems.
11) Check developing time.
12) Check for dryer heat and operation of both fans.
13) Check transport of material.
14) Drain Processor.
15) Charge with fresh chemistry.
Figure 2-5, Operational Checklist
2-13
Summary of Contents for Mini-Medical Series
Page 4: ......
Page 10: ......
Page 12: ......
Page 14: ......
Page 16: ......
Page 26: ...Introduction Mini Med Series 0000061122 ...
Page 28: ......
Page 30: ......
Page 44: ...Installation Mini Med Series 0000061122 Notes 2 14 ...
Page 46: ......
Page 56: ......
Page 66: ......
Page 98: ......
Page 120: ...Parts Mini Med Series 0000061122 6 22 Notes ...
Page 122: ......
Page 129: ...Accessories Mini Med Series 0000061122 Notes 7 7 ...
Page 130: ......
Page 131: ......