61202800L1-1B
IQ 710
Section 5, Detail Level Procedures
Page 85
© 2002 ADTRAN, Inc.
IQ 710 System Manual
LOGGING IN TO THE SYSTEM
Introduction
Once connected to the IQ 710 via either a VT-100 terminal or PC configured as a VT-100 terminal, it is
necessary to login to the system to gain access to the management and provisioning functions. This DLP
provides specific steps for logging into the system and accessing the various management and provisioning
functions.
Prerequisite Procedures
Complete DLP-001,
Connecting the Terminal or PC to the Craft/Control Port
before logging in to IQ 710.
Tools and Materials Required
•
Male-to-female DB-9 cable (customer-provided) to connect to a VT-100 terminal or a PC configured
as a VT-100 terminal
•
VT-100 terminal or PC configured as a VT-100 terminal
•
DB-9 to DB-25 adapter if the PC’s com port is DB-25 (customer-provided)