81
4. Start the task
For part of the content, refer to Start the task in paragraph 6.1.1.4.
During the task performing, the calibrator will output electrical signals according to the set point and measure
the DUT output signal, no manually input required during the process.
5. Finish the task
Refer to Finish the task in paragraph 6.1.1.5.
6.4.3 Signal isolator/ converters
1. Connect to DUT
Connect the DUT input with the output module of the calibrator, as shown in the figure 14 (for current output) or
13 (for voltage output). Connect the DUT output with the electrical measurement module of the calibrator
according to the DUT signal type, as shown in figure 7(Current Measurement) and figure 6(Voltage
Measurement).
2. Create the task
Create the corresponding DUT tasks as described above, and fulfill the necessary information. See Table 26
Table 35 Signal isolator task setting
Subject
Valid value
Description
Name
Numbers, letters, symbols
Task name
S/N
Numbers, letters, symbols
Task S/N
Model
Numbers, letters, symbols
Model of DUT
Input
(4~20)mA,(0~10)mA,(0~20)mA,(1~5)V,(0~5)V,(0~10)V, custom
Input range of DUT
Output
(4~20)mA,(0~10)mA,(0~20)mA,(1~5)V,(0~5)V,(0~10)V, custom
Output range of DUT
Summary of Contents for 226
Page 1: ...226 227 Multifunction Process Calibrator...
Page 2: ......
Page 3: ...ADT226 227 Multifunction Process Calibrator User Manual Version 2306V01 Additel Corporation...
Page 4: ......
Page 6: ......
Page 31: ...19 1 4 Basic Structure Figure 1 Basic Structure...
Page 33: ...21 Figure 2 Power adaptor...
Page 64: ...52 External module information including external module A and external module B...
Page 107: ...95...