60
Set point
Numbers
Action set point of the DUT
Set action type
Open / closed
Action type of the DUT
Dead band
Numbers
Dead band range of the DUT
Owner
Numbers, letters, symbols
Owner of DUT
Location
Numbers, letters, symbols
Location of DUT
Note
Numbers, letters, symbols
Additional information
3. Task setting
Refer to the task setting in paragraph 6.1.1.3.
4. Start the task
For part of the content, refer to Start the task in paragraph 6.1.1.4
When the pressure switch moves (open/close) during the task, the calibrator will automatically record the
pressure value at the moment of the action, without manually input.
5. Finish the task
Refer to Finish the task in paragraph 6.1.1.5.
6.1.4 I/P Converter
1. Connect to DUT
Connect the external pressure module to the Lemo type connection A or B.
As shown in the Figure 17, connect the DUT output with calibrator’s electrical module.
Summary of Contents for 226
Page 1: ...226 227 Multifunction Process Calibrator...
Page 2: ......
Page 3: ...ADT226 227 Multifunction Process Calibrator User Manual Version 2306V01 Additel Corporation...
Page 4: ......
Page 6: ......
Page 31: ...19 1 4 Basic Structure Figure 1 Basic Structure...
Page 33: ...21 Figure 2 Power adaptor...
Page 64: ...52 External module information including external module A and external module B...
Page 107: ...95...