![ABB RED670 Relion 670 series Commissioning Manual Download Page 82](http://html.mh-extra.com/html/abb/red670-relion-670-series/red670-relion-670-series_commissioning-manual_3169082.webp)
IEC140000134-1-en.vsd
IEC140000134 V1 EN-US
1.1. Navigate to the
Settings
tab.
1.2. Force the IP stack to IPv4 by setting the parameter
ForceIPv4
to
True
.
2.
Set the Connection Parameters on PMU Connection Tester for TCP
communication according to the PMU configuration.
IEC140000135-1-en.vsd
IEC140000135 V1 EN-US
2.1. Set
Host IP
to the PMU IP address configured for the port in use. Here
the LANAB:1 IPAddress (192.168.1.10) is set.
2.2. Set
Port
to the IED's TCP port set in the PMU under parameter
C37.118TCPport (4712 is default). Alternatively, in order to make an
Section 9
1MRK 505 378-UEN A
Establishing connection and verifying the IEEE C37.118/1344 communication
76
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...