Test for fast fault clearing
•
Connect the test set for the injection of three phase voltages and currents to the
appropriate terminals of the IED.
•
Enable the fast fault clearance by setting
FastOperation
to TRUE, and also
connect the inputs
BLKDLFLT
to TRUE and
FUSEFAIL
to FALSE.
•
Also assume circuit breaker is in closed position, that is
CBCLOSED
is high,
prior to fault occurrence.
•
Create a single phase fault on phase L1 such that phase L1 voltage is lower
than
UPhSel<
times quadrature phase to phase voltage and set
Tau
to default
value.
•
Activate carrier receive CR signal.
•
Check that
TRIP
,
TRL1
,
ARST
and
ARSTL1
are generated with the
conditions described.
•
Check that activated trip signals and start signals are blocked by enabling
BLKTR
and
BLKST
.
•
Check that all activated signals are disabled by
BLOCK
input.
•
If required, perform creating faults on the remaining phases in the similar way.
Test of delayed fault clearing for single pole tripping
•
Connect the test set for the injection of three phase voltages and currents to the
appropriate terminals of the IED.
•
Enable the delayed fault clearance for single pole tripping by setting
Del1phOp
to
1Ph (On)
,
Del3PhOp
to
FALSE (Off)
and also connect the inputs
BLKDLFLT
and
FUSEFAIL
to FALSE.
•
Also assume circuit breaker is in closed position, that is input
CBCLD
is high,
prior to fault occurrence.
•
Create a single phase fault on phase L1 such that phase L1 voltage is lower
than
UPhSel<
times quadrature phase to phase voltage and set
Tau
to default
value and also inject the residual current such that it exceeds set
IN>
value.
•
Check that output
TRIN
is activated after a set delay of
tResCurr
if
ResCurrOper
is set to high.
•
Check that
TRIP
and
TRL1
are generated with the conditions described after a
set delay time of
t1Ph
and the outputs
ARST
and
ARSTL1
are also activated. .
•
Check that activated trip signals and start signals are blocked by enabling
BLKTR
and
BLKST
.
•
Check that all activated signals are disabled by
BLOCK
input.
•
If required, perform creating faults on the remaining phases in the similar way.
Test of delayed fault clearing for three pole tripping
•
Connect the test set for the injection of three phase voltages and currents to the
appropriate terminals of the IED.
•
Enable the delayed fault clearance for three pole tripping by setting
Del3phOp
to
TRUE (On)
,
Del1PhOp
to
3Ph (Off)
and also connect the inputs
BLKDLFLT
and
FUSEFAIL
to FALSE.
•
Also assume circuit breaker is in closed position, that is, the input
CBCLOSED
is high prior to fault occurrence.
1MRK 505 378-UEN A
Section 11
Testing functionality by secondary injection
Line differential protection RED670 2.2 IEC
207
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...