1.
Check that the IED settings are appropriate, for example the start value and
the time delay.
2.
Supply the IED with three-phase voltages at their rated values and initial
frequency.
3.
Slowly increase the frequency of the applied voltage with a 40 mHz step,
applying it for a period that is 10% longer than
tDelay
.
4.
Note the operate value and compare it with the set value.
5.
Decrease the frequency to rated operating conditions.
6.
Check that the START signal resets.
7.
Set the frequency to 20 mHz under the operate value.
8.
Increase the frequency with a 40 mHz step, applying it for a period that is
10% longer than
tDelay
.
9.
Measure the time delay for the TRIP signal, and compare it with the set value.
Note that the measured time consists of the set value for time delay plus
minimum operate time of the start function (80 - 90 ms).
Extended testing
M16290-28 v4
1.
The test above can be repeated to check the time to reset.
Verification of the low voltage magnitude blocking
M16290-34 v6
1.
Check that the settings in the IED are appropriate, for example the
StartFrequency
and the
tDelay
.
2.
Supply the IED with three-phase voltages at their rated values.
3.
Slowly decrease the magnitude of the applied voltage, until the BLKDMAGN
signal appears.
4.
Note the voltage magnitude value and compare it with the set value.
5.
Slowly increase the frequency of the applied voltage, to a value above
StartFrequency
.
6.
Check that the START signal does not appear.
7.
Wait for a time corresponding to
tDelay
, make sure that the TRIP signal does
not appear.
11.7.2.2
Completing the test
M16290-52 v5
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
11.7.3
Rate-of-change frequency protection SAPFRC
M16256-2 v6
Prepare the IED for verification of settings outlined in Section
11.7.3.1
Verifying the settings
M16256-8 v1
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
210
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...