![ABB RED670 Relion 670 series Commissioning Manual Download Page 277](http://html.mh-extra.com/html/abb/red670-relion-670-series/red670-relion-670-series_commissioning-manual_3169277.webp)
The
ActiveGroup
menu is located on the local HMI under
Main menu/Test/
Function status/Setting groups/ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the
IED and observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting
groups are described in the corresponding PCM600 documents and
instructions for the operators within the SCS are included in the SCS
documentation.
11.17.1.2
Completing the test
M11369-39 v4
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
11.18
Exit test mode
SEMOD53244-3 v5
The following procedure is used to return to normal operation.
After exiting the IED test mode, make sure that the MU is returned
to normal mode.
1.
Navigate to the test mode folder.
2.
Change the
On
setting to
Off
. Press the 'E' key and the left arrow key.
3.
Answer
YES
, press the 'E' key and exit the menus.
1MRK 505 378-UEN A
Section 11
Testing functionality by secondary injection
Line differential protection RED670 2.2 IEC
271
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...