SESRSYN
CBConfig
setting
Section to
be
synchroniz
ed
Activated
B1QCLD
input on
IED from
Activated
B2QCLD
input on
IED from
Activated
LN1QCLD
input on
IED from
Activated
LN2QCLD
input on
IED from
Indication
from
SESRSYN
on IED
SESRSYN 2
(Operates on
TIE_QA1)
Tie CB
LINE1 –
LINE2
LINE1_Q
B9
LINE2_Q
B9
LN1SEL,
LN2SEL
WA1 –
LINE2
WA1_QA
1
LINE2_Q
B9
B1SEL,
LN2SEL
WA2 –
LINE1
WA2_QA
1
LINE1_Q
B9
B2SEL,
LN1SEL
WA1 –
WA2
WA1_QA
1
WA2_QA
1
B1SEL,
B2SEL
SESRSYN 3
(Operates on
WA2_QA1)
1 ½ bus
alt. CB
(mirrored)
WA2 –
LINE2
LINE2_Q
B9
B2SEL,
LN2SEL
WA2 –
LINE1
TIE_QA1
LINE1_Q
B9
B2SEL,
LN1SEL
WA2 –
WA1
TIE_QA1
WA1_QA
1
B1SEL,
B2SEL
WA1
WA2
WA1_QA1
(SESRSYN 1)
WA2_QA1
(SESRSYN 3)
TIE_QA1
(SESRSYN 2)
LINE1
LINE2
LINE1_QB9
LINE2_QB9
IEC11000274-3-en.vsd
IEC11000274 V3 EN-US
Figure 52:
Objects used in the voltage selection logic
11.10.1.5
Completing the test
M2377-1042 v5
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
1MRK 505 378-UEN A
Section 11
Testing functionality by secondary injection
Line differential protection RED670 2.2 IEC
229
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...