11.4.14.1
Completing the test
GUID-8BD66BC8-AAC3-41C4-B819-B159361688D2 v4
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
11.4.15
Phase preference logic PPL2PHIZ
GUID-E1547542-1407-4488-AD99-2A7D063885A4 v1
Prepare the IED for verification of settings outlined in Section
The Phase preference logic function PPL2PHIZ is tested with a three-phase testing
equipment for distance protections. PPL2PHIZ is tested in co-operation with the
High speed distance protection ZMFPDIS . The distance protection and the phase
preference logic shall be set to values according to the real set values to be used.
The test is made by means of injection of voltage and current where the amplitude
of both current and voltage and the phase angle between the voltage and current
can be controlled.
During the test the following binary signals (outputs) shall be monitored:
•
Trip signal from distance protection
•
Start signal from phase preference logic
1. Connect the test set for injection of voltage and current.
2. Inject voltages and currents corresponding to a phase-to-phase to earth fault
within zone 1 of the distance protection function. In the test one of the current
inputs (one of the faulted phases) is disconnected. The remaining current is the
fault current out on the protected line. All combinations of two phase-to-earth
faults with one phase current are tested. The result shall be according to table
. It should be checked that the fault will give phase-to-phase voltage, phase-
to-earth voltage, zero-sequence voltage and phase current so that the
conditions set for the logic are fulfilled.
Table 35:
Operation at different combinations of faults and operation mode
OperMode
Fault type/Faulted phase current to the IED
L1L2N/IL1
L1L2N/IL2
L2L3N/IL2
L2L3N/IL3
L3L3N/IL1
L3L1N/IL3
No Filter
Trip
Trip
Trip
Trip
Trip
Trip
No Pref
Trip
Trip
Trip
Trip
Trip
Trip
1231c
Trip
No Trip
Trip
No Trip
No Trip
Trip
1321c
No Trip
Trip
No Trip
Trip
Trip
No Trip
123a
Trip
No Trip
Trip
No Trip
Trip
No Trip
132a
Trip
No Trip
No Trip
Trip
Trip
No Trip
213a
No Trip
Trip
Trip
No Trip
Trip
No Trip
231a
No Trip
Trip
Trip
No Trip
No Trip
Trip
312a
Trip
No Trip
No Trip
Trip
No Trip
Trip
321a
No Trip
Trip
No Trip
Trip
No Trip
Trip
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
170
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...