Table 42:
Activate output signals if OpMode = 1 Out Of 2
OUTPut
Non
X
TRIP
X
X
X
X
X
X
X
X
X
TRL1
X
X
TRL2
X
X
TRL3
X
X
11. Connect the trip output to a timer.
12. Have inputs CR1 and CR2 activated. Start the timer from activation from
activation of input LOCTR and stop the timer from TRIP output.
13. Check the trip time.
Completing the test
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
11.11.7.5
Negative sequence overvoltage protection LCNSPTOV
GUID-BEF622E8-E133-4346-98D4-EC0732878937 v1
Prepare the IED for verification of settings as outlined in section
and section
I E D T E S T S E T
UL1
UL2
UL3
UL1
UL2
UL3
IED
IEC10000014-1-en.vsd
IEC10000014 V1 EN-US
Figure 54:
Connection of test equipment
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
252
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...