11.4.10.1
Testing the carrier send and trip signals
M14946-8 v3
Procedure
1.
Set the operation of all distance zones, which are supposed to be blocked by
the operation of ZMRPSB, to
Off
.
2.
Configure the STPSD functional inputs to the TRIP output of the
underreaching power-swing zone, if the underreaching communication
scheme is used.
3.
Start instantaneously any kind of fault within the underreaching power-swing
zone and check, that:
•
The CS signal appears after the time delay, which is equal to the sum of
set time delays for the underreaching zone
tnPP
or
tnPE
(dependent on
the type of fault) and for the carrier send security timer
tCS
. Also add
the usual operate time for the underreaching zone (approximately
30ms).
•
The TRIP signal appears after the time delay, which is equal to the sum
of set time delays for the underreaching zone
tnPP
or
tnPE
(dependent
on the type of fault) and for the trip security timer
tTrip
. Also add the
usual operate time for the underreaching zone (approximately 30ms).
4.
Simulate the receiving of the carrier signal so that the functional input signal
CR becomes a logical one.
5.
Configure the STPSD input to connect to the output START of the carrier
accelerating zone (Power-swing overreaching zone).
6.
Initiate any kind of fault within the carrier accelerating zone and check that
the TRIP signal appears after the time, which is equal to the time delay set on
the trip timer
tTrip
.
Also consider the (average) operate time of the carrier acceleration zone
(approximately 30ms).
11.4.10.2
Testing the influence of the residual overcurrent protection
M14946-28 v5
Additionally connect the IED according to the test instructions for the four step
residual overcurrent protection function EF4PTOC, if the Power swing logic
(PSLPSCH) is configured in a way that is controlled by this protection.
Procedure
1.
Initiate a single phase-to-earth fault within both power-swing zones.
Make sure that none of CS or TRIP output signals appear after the time
delays
tCS
and
tTrip
.
BLKZMUR must appear together with the fault and must remain active until
the fault has been switched off plus the time delay, as set on the
tBlkTr
timer.
2.
Initiate a phase-to-phase fault within the operating area of both power-swing
zones.
1MRK 505 378-UEN A
Section 11
Testing functionality by secondary injection
Line differential protection RED670 2.2 IEC
145
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...