![ABB RED670 Relion 670 series Commissioning Manual Download Page 208](http://html.mh-extra.com/html/abb/red670-relion-670-series/red670-relion-670-series_commissioning-manual_3169208.webp)
UL1
UL2
UL3
UN
UL1
UL1
UL2
UL3
IE
D
T
E
S
T
S
E
T
IE
D
IEC07000106-1-en.vsd
UL2
UL3
UN
1
2
IEC07000106 V2 EN-US
Figure 46:
Connection of the test set to the IED for test of U1 block level
where:
1
is three-phase voltage group1 (U1)
2
is three-phase voltage group2 (U2)
3.
Decrease slowly the voltage in phase UL1 of the test set until the START
signal resets.
4.
Check U1 blocking level by comparing the voltage level at reset with the set
undervoltage blocking
U1Low
.
5.
to
U1Low
for the other phases.
The connections to U1 must be shifted to test another phase.
(UL1 to UL2, UL2 to UL3, UL3 to UL1)
Check of U2Low
SEMOD175258-91 v3
Procedure
1.
Connect voltages to the IED according to valid connection diagram and
figure
.
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
202
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...