The voltage difference between the voltage connected to U-Bus and U-Line
should be 0%, so that the AUTOSYOK and MANSYOK outputs are activated
first.
2.
Change the U-Line voltage connection to U-Line2 without changing the
setting on the local HMI. Check that the two outputs are not activated.
11.10.1.3
Testing the energizing check
M2377-262 v6
During the test of the energizing check function for a single bay arrangement, these
voltage inputs are used:
U-Line
UL1, UL2 or UL3 line1 voltage inputs on the IED
U-Bus
Bus voltage input on the IED
General
M2377-271 v6
When testing the energizing check function for the applicable bus, arrangement
shall be done for the energizing check functions. The voltage is selected by
activation of different inputs in the voltage selection logic.
Live voltage level is fixed to 80%
UBase
and dead voltage level to fixed 40%
UBase
.
The test shall be performed according to the settings for the station. Test the
alternatives below that are applicable.
Testing the dead line live bus (DLLB)
M2377-276 v7
The test should verify that the energizing check function operates for a low voltage
on the U-Line and for a high voltage on the U-Bus. This corresponds to the
energizing of a dead line to a live bus.
1.
Apply a single-phase voltage 100%
GblBaseSelBus
to the U-Bus, and a
single-phase voltage 30%
GblBaseSelLine
to the U-Line.
2.
Check that the AUTOENOK and MANENOK outputs are activated after set
tAutoEnerg
respectively
tManEnerg
.
3.
Increase the U-Line to 60%
GblBaseSelLine
and U-Bus to be equal to 100%
GblBaseSelBus
. The outputs should not be activated.
4.
The test can be repeated with different values on the U-Bus and the U-Line.
Testing the dead bus live line (DBLL)
M2377-289 v8
The test should verify that the energizing check function operates for a low voltage
on the U-Bus and for a high voltage on the U-Line. This corresponds to an
energizing of a dead bus to a live line.
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
226
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...