This is done with a speed so that the final impedance is reached after 1s. As
the injected voltage is lower than 0.92
UBase
the START signal should be
activated. In addition to this the signal ZONE2 should be activated.
7.
Set
N2Limit
to 1 and repeat step
.
Now the signals TRIP2 and TRIP should be activated.
IED
B
A
E
B
E
A
X’
d
X
T
Z
S
Zone 1
Zone 2
jX
R
ZB
ZA
Pole slip
impedance
movement
Zone 2
Zone 1
WarnAngle
TripAngle
f
ZC
IEC07000099_2_en.vsd
IEC07000099 V2 EN-US
Figure 38:
Setting of the pole slip protection PSPPPAM
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
148
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...