A CB condition CBREADY of a type, OCO shall be high (true) before and during
tripping (start auto reclosing). During tripping it goes low for a recharging time, for
example, 10s. It may thus be low at the instant of reclosing. After each Open or
Close operation it may need a recharging period before it goes high again.
In the example of CB simulation arrangement, the CBREADY condition is
simulated by a manual switch, SRY.
Information and material for the verification:
•
Protection or control unit, IED, configured and with settings entered.
•
Configuration diagram for the IED
•
Terminal diagram for the IED, or plant circuit diagram including the IED
•
Technical reference manual for the IED
•
IED test set for secondary injection
•
Means to indicate, measure and record operation and times, for example an
event recording facility
•
A bi-stable relay (BR) or two auxiliary relays to simulate a CB
•
Two push-buttons (SC, ST) to operate the BR and a change-over switch (SRY)
to simulate CBREADY
•
Possibly a switch simulation the synchronizing check SESRSYN condition
IED
CLOSECB
Trip
CBCLOSED
CBREADY
BR
SC
ST
SRY
To test
set
+
-
IEC04000202-3-en.vsd
IEC04000202 V3 EN-US
Figure 53:
Simulating the CB operation by a bi-stable relay/breaker simulator
and manual switches
1MRK 505 378-UEN A
Section 11
Testing functionality by secondary injection
Line differential protection RED670 2.2 IEC
231
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...