PILOTFUF signals are simultaneously activated. Only the output circuit
related to the open phase will be active i.e either MAINFUF or PILOTFUF.
3. Establish a normal voltage operating condition and observe the corresponding
output signals. MAINFUF or PILOTFUF should change to
0
in about 27 ms.
4. Set normal conditions as mentioned in step 1.
5. Enable the BLOCK binary input and repeat step 2. MAINFUF or PILOTFUF
should not appear.
Checking the operation of MAINFUF and PILOTFUF
1. Simulate normal operation conditions with three-phase voltage on the main
fuse group and the pilot fuse group. Ensure the values are equal to their rated
values.
2. Decrease one of the three-phase voltages on main fuse group or pilot fuse
group. The voltage change must be greater than the set value for
Ud>MainBlock
or
Ud>PilotAlarm
. MAINFUF or PILOTFUF signals are
activated without any time delay.
3. Set normal conditions as mentioned in step 1. MAINFUF or PILOTFUF
signals should reset.
4. Set
SealIn
to
On
,
UD>MainBlock
to 20% of
UBase
and
USealIn
to 70% of
UBase
.
5. Apply three-phase voltages with the value slightly below
USealIn
level.
6. Decrease one of the three-phase voltages on main fuse group. The voltage
change must be greater than the set value for
Ud>MainBlock
. MAINFUF
signal is activated.
7. After more than 5 seconds increase the measured voltage back to the value
slightly below
USealIn
level. MAINFUF signal should not reset.
8. Slowly increase measured voltage to the value slightly above
USealIn
until
MAINFUF signal resets.
9. Record the measured voltage and compare with the set value
USealIn
.
11.9.3.1
Completing the test
GUID-38A57549-E6BF-46CB-ADFB-79305684EB67 v1
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore connections and settings to their original values, if they were
changed for testing purposes.
11.10
Control
SEMOD53560-1 v1
11.10.1
Synchrocheck, energizing check, and synchronizing
SESRSYN
M2377-3 v12
This section contains instructions on how to test the synchrocheck, energizing
check, and synchronizing function SESRSYN for single, double and 1½ breaker
arrangements.
Section 11
1MRK 505 378-UEN A
Testing functionality by secondary injection
220
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...