202 Maintenance instructions
Manual Power Quality Filter PQFM
Project:
LV Active Filters PQF
Issued by:
Servicing report
Date:
Page 3 of 4
Condition of filter main contactor, contactors and fuses
•
Main contactor is OK? (Y/N)
•
Contactors can move freely? (Y/N)
•
Fuses are OK? (Y/N)
(auxiliary fuses, (optional) main fuses, upstream fuses, …)
If ‘N’, describe the problems in the ‘comments’ section of this report.
Tightness of electrical and mechanical connections
•
Check tightness of all electrical connections
•
Check the mechanical fixation of all components
Retighten connections/fixations if necessary
Correct the outstanding problems
Restart the filter upstream protection and restart the filter
•
Close the auxiliary circuit fuse box and apply power to the unit
o
Control board LEDs light up
o
PQF-Manager booting
o
Fan(s) start(s) running
Start the filter
If major servicing work has been done, follow the commissioning instructions to start the filter.
10.7.3 Special service actions
Fan replacement
•
Fan operating hours?
DC capacitor replacement
•
Filter operating hours?
•
Ambient filter conditions?
•
Describe in the ‘comments’ section of this report.
DC capacitor reforming (CE versions only)
•
Filter storage time?
•
Reforming time?
•
Describe in the ‘comments’ section of this report.