ACS2000 User manual
2UEA001270 Rev. F
10-31 (32)
Chapter 10 - Troubleshooting and maintenance
10
Frames 2, 3 - Mount the lifting hoist
to the drive per hoist instructions.
Hook up the lifting harness at
locations shown.
Using the hoist, lift the phase
module off the module tray.
11
Place the new module on the tray.
12
Gently push the phase module
back into the rack, ensuring cables
are not pinched against the
cabinet, as far as it goes.
Tighten the fastening bolts that
secure module to cabinet on each
side.
Summary of Contents for ACS2000 DFE
Page 1: ...Medium Voltage Drives User Manual ACS2000 4 kV ...
Page 2: ......
Page 12: ...LOF 4 4 2UEA001270 Rev F ACS2000 User manual ...
Page 14: ...LOT 2 2 2UEA001270 Rev F ACS2000 User manual ...
Page 40: ...1 12 12 2UEA001270 Rev F ACS2000 User manual Chapter 1 Safety ...
Page 68: ...2 28 28 2UEA001270 Rev F ACS2000 User manual Chapter 2 Power electronics and cabinet features ...
Page 94: ...3 26 26 2UEA001270 Rev F ACS2000 User manual Chapter 3 Control system ...
Page 116: ...5 14 14 2UEA001270 Rev F ACS2000 User manual Chapter 5 Mechanical installation ...
Page 134: ...7 2 6 2UEA001270 Rev F ACS2000 User manual Chapter 7 Commissioning ...
Page 138: ...7 6 6 2UEA001270 Rev F ACS2000 User manual Chapter 7 Commissioning ...
Page 156: ...8 18 18 2UEA001270 Rev F ACS2000 User manual Chapter 8 Local operation ...
Page 213: ......