07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
92/184
7.5.1.5
Preparing cables for cable entries with sealing modules
As a standard, the cabinet is delivered for cable entry through the roof of the terminal
compartment. If cables are entered through the floor, swap entry plate and cover plate.
- Prepare cables with an outer cable screen or shield for EMC bonding with the metal
enclosure of the cabinet as illustrated in Fig. 7-7.
Figure 7-7: Preparing power cables for sealing modules
- Install the sealing modules according to the instructions of the sealing module supplier.
(1) Sealing module
(2) Frame
(3) Conductive foil of sealing module
(4) Cable clamp
(5) Shrinkable sheath seal
(6) Heat-shrinkable termination
(7) Outer cable sheath
(8) Cable sheath removed to expose cable shield
(9) Shield extension to be connected to PG busbar
(10)Screen extension to be connected to the
PG busbar
(11)Cable lug as specified by the cable supplier and
suitable for M12 bolt
1
2
3
4
5
6
7
8
9
10
11
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......