09 OPERATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
121/184
9.7
Starting the drive
9.7.1
Checks before starting the drive
▲
DANGER
⚠
When the drive is put into service after it has been commissioned, or after it has been taken
out of service for a longer period, use the following checklist:
9.7.2
Starting the drive remotely
When the drive is operated from remote through a higher-level control system or an operator
control desk, follow the instructions in the appropriate manuals.
9.7.3
Starting the drive locally
1. Enable the local control mode of the drive.
2. Check that no alarm or fault messages are displayed on the CDP control panel.
- If a fault message is displayed on the CDP control panel, reset the fault.
It is recommended to have the following documents at hand when starting the
drive locally for the first time after commissioning:
- “Appendix D – Wiring diagrams” to identify the circuit breakers to be
switched on
- “10 CDP control panel” on page 127 for information on functions and features of
the CDP control panel
Hazardous voltages!
- All covers must be screwed in place to prevent unintentional contact with
energized components.
1.
Tools and foreign objects are inside the cabinet.
□
2.
All auxiliary power supplies from external sources are switched on.
□
3.
All internal circuit breakers of the drive are closed.
□
4.
All covers are mounted and the doors are closed, locked or bolted.
□
5.
Grounding switch is in the ungrounded position.
□
6.
MCB is in operating position.
□
7.
No run interlocks are active.
□
LOC
RESET
REF
REM
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......