10 CDP CONTROL PANEL
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
143/184
10.3.3.3
Enabling / unlocking a parameter lock
Unwanted parameter entry can be prevented by activating the parameter lock function.
The corresponding parameters are 16.02 PARAMETER LOCK and 16.03 PASSCODE and belong
to parameter group 16 SYSTEM CTRL INPUTS.
10.3.3.3.1 Enabling the parameter lock
1. Select parameter 16.02.
2. Set parameter 16.02 to 1 (LOCKED).
3. Confirm the setting and exit the parameters mode.
10.3.3.3.2 Unlocking the parameter lock
1. Select parameter 16.03.
2. Set the correct pass code.
3. Confirm the setting and exit the parameters mode.
10.3.3.4
User lock
For better cyber security, ABB recommends that you set a master pass code for the control
panel to prevent the parameter values from being changed.
NOTICE
- To activate the user lock for the first time, enter the default pass code, 358, into
16.03
Passcode
. This will make parameters
16.06
…
16.07
changeable. Then enter the old pass
code to
16.06 OldUserPasscode
and change user pass code in
16.07 NewUserPasscode
. In
16.02 Parameter Lock
, the user lock functionality can now be enabled.
- To reopen the lock, enter your pass code into
16.03 Passcode
. This will again make
parameters
16.06
and
16.07
visible.
For more information, see Appendix G – Signal and parameter table.
ABB is not be liable for damages or losses caused by the failure to activate the
user lock with a new pass code.
For more information, see “1.10 Cyber security disclaimer” on page 10.
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......