08 COMMISSIONING
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
111/184
8.2.3
Main circuit breaker (MCB) checklist
8.2.4
Input transformer checklist
8.2.5
Motor checklist
8.2.6
Insulation tests checklist
1.
Type of MCB selected as per the MCB specification from ABB
□
2.
High-voltage connections completed
□
3.
MCB ready to be tested with drive
□
4.
MCB protection relay settings tested
□
5.
Safety devices (eg, door locks) tested and in operation
□
1.
Ground connection completed
□
2.
Transformer auxiliaries (eg, dehydrating breathers, cooling,
protection devices) ready
□
3.
Safety devices (eg, door locks) tested and in operation
□
1.
Motor installed, aligned and alignment protocol available
□
2.
Motor not coupled to driven load
□
3.
Ground connection completed
□
4.
Motor auxiliaries (eg, bearing lubrication, heater cooling) ready
□
5.
Control and monitoring signals connected
□
1.
All power cables to converter transformer, between converter transformer and
drive, and from drive to motor insulation resistance tested (Megger test), and
measured values within the required limits.
□
2.
Test report of the Megger insulation resistance test available
Important:
If the test is carried out by the commissioning engineer of the drive,
an additional day per drive motor combination needs to be reserved. After the
test, the feeder cables can be connected, except at the drive end. The test must
comply with the specification.
□
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......