02 IMPORTANT SAFETY INFORMATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
18/184
2.4
Product safety labels
Safety labels are affixed to the drive components to alert personnel of potential hazards when
working on the equipment. For more information, see the label placement document for
the drive.
The instructions on the safety labels must always be followed and the labels must be kept in a
perfectly legible condition.
Figure 2-1: Product warning label examples (label placement depends on the drive)
Additional safety labels, including the following, might also be provided:
(1) Danger label
(2) Caution label
(3) Warning label
(4) Notice label
Electricity hazard
This sign can also have additional text below it, eg, “High voltage”
Hot surface
Crushing of hands
No access for people with active implanted cardiac device
The magnetic field of the drive can influence the functioning of pacemakers. The
pacemaker sign should be installed at the entrance to the drive room or at a
minimum distance of 6 m from the drive to stop personnel with pacemakers
approaching the drive.
Firefighting sign
Outlines the procedure when fighting fire in electrical equipment. The sign must
be installed well visible near the drive.
High voltage sign
Must be installed clearly visible at the main circuit breaker in the switchgear room.
The sign alerts personnel to the high voltage which can be present on the
secondary side of the input transformer until the main circuit breaker has been
opened and secured and the drive has been de-energized and grounded.
1
2
3
4
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......