![ABB ACS 1013-A1 User Manual Download Page 100](http://html.mh-extra.com/html/abb/acs-1013-a1/acs-1013-a1_user-manual_3266100.webp)
07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
98/184
7.6
Auxiliary power, control and serial
communication cables
7.6.1
Preparing the cable entry and the cables
7.6.1.1
Determining the cable length
1. Determine the required length of a cable between the point of entry and the connection
point (1 in Fig. 7-12) inside the cabinet.
2. Cut the cable to the required length before connection.
Figure 7-12: Cable entry from top (
A
), from bottom (
B
)
See Layout drawing in Appendix C – Mechanical drawings for information on:
- Project-specific cable entry
- Dimensions between point of cable entry and terminals
See Appendix D – Wiring diagrams for information on:
- Conventions for cross-references and device identification
- Terminal designations
1
1
A
B
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......