11 PREVENTIVE AND CORRECTIVE MAINTENANCE
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
167/184
Important:
When the checklist is completed, carefully try to turn the grounding switch to the
grounded position.
b) If the CDP control panel does not display a fault, check that digital output
DO04 of I/O module -A5191 (-A1) is energized.
- DO04 releases the grounding switch and lights the lamp GROUNDING
SWITCH UNLOCKED (–H5152).
- When the LED of DO04 is lit and the control voltage is present at
terminals X24:2 and X24:3 of DO04, DO04 is energized.
□
c) If digital output DO04 of the I/O module is not energized, check the I/O
module -A5191 (-A1).
To do this, check if the auxiliary voltage is present at the supply terminals
of the I/O module.
- X6:1.....24 V (DC)
- X6:2.....0 V
□
d) Check that LED V726 and LED V740 of the I/O module -A5191 are lit.
The LEDs monitor the control voltages of the I/O module (Fig. 11-3).
When the LEDs are lit, the I/O module functions properly.
- LED V726.....24 V (DC)
- LED V740.....5 V (DC)
□
e) If digital output DO04 I/O module -A5191 is energized, check that the
control voltage is present at the terminals of the lamp GROUNDING
SWITCH UNLOCKED.
- If the control voltage is present but the lamp is not lit, the lamp is burnt
out. Replace the lamp.
- If the control voltage is not present, check the wiring of the lamp.
Correct the wiring if necessary.
□
5.
Check that hazardous voltages from the motor cannot be
fed into the drive.
□
If you cannot turn the grounding switch but doors of medium voltage
compartments have to be opened, call the ABB service organization.
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......