07 ELECTRICAL INSTALLATION
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
93/184
7.5.1.6
Preparing cables for cable entries with cable glands
Prepare cables with an outer cable screen or shield for EMC bonding with the metal enclosure
of the cabinet as illustrated in Fig. 7-8.
Figure 7-8: Preparing power cables for cable glands
7.5.2
Connecting the cables
7.5.2.1
Checking the cable insulation
- Check the insulation of each cable before connection and verify that the results are within
the specification of the cable manufacturer.
- Leave the cable conductors unconnected at both ends until the commissioning engineer
has given permission.
(1) Outer cable sheath
(2) Cable gland
(3) Conductor insulation removed to expose
cable shield
(4) Plate
(5) Screen extension to be connected to
PE ground busbar
(6) Heat-shrinkable termination
1
2
3
4
5
6
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......