08 COMMISSIONING
3BHS213401 E01 REV H
ACS1000 AIR-COOLED
USER MANUAL
109/184
8.1
Overview
The following sections provide an overview of the commissioning process for your drive.
8.1.1
Required qualification
8.1.2
Commissioning procedure
8.1.3
Commissioning checklist
8.1.4
Customer assistance
8.1.5
Customer acceptance
Commissioning, parameter adjustments and functional tests of the drive must be
carried out only by commissioning personnel certified by ABB.
Information on the commissioning procedure and the start conditions for
commissioning can be obtained from ABB.
In order to ensure uncomplicated and speedy commissioning, it is important that
drive and associated equipment are ready for commissioning. Reviewing and
completing the items in the “8.2 Commissioning checklist” on page 110 before the
commissioning personnel arrive on site will help to achieve this.
During the commissioning period, the customer is requested to provide qualified
personnel for assistance, who are:
- Experienced with medium and low voltage equipment and with the local
safety regulations
- Familiar with the driven process
- Authorized to operate associated medium and low voltage equipment (eg, main
circuit breaker, other low and medium voltage switchgear)
- Authorized to operate the driven process for functional tests
When commissioning has been completed, the commissioning report is signed by
the responsible commissioning personnel and by the customer as a sign of
acceptance. A copy of the report and a copy of the actual parameter settings are
handed out to the customer.
Summary of Contents for ACS 1013-A1
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000 air cooled User manual ...
Page 3: ...Contents ACS1000 air cooled User manual ...
Page 5: ... 01 About this manual 01 3 14 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 15 26 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 27 50 ...
Page 53: ... 04 Control system 04 51 66 ...
Page 68: ......
Page 69: ... 05 Transportation storage and disposal05 67 74 ...
Page 76: ......
Page 77: ... 06 Mechanical installation 06 75 82 ...
Page 84: ......
Page 85: ... 07 Electrical installation07 83 106 ...
Page 108: ......
Page 109: ... 08 Commissioning 08 107 112 ...
Page 115: ... 09 Operation 09 113 126 ...
Page 129: ... 10 CDP control panel 10 127 150 ...
Page 153: ... 11 Preventive and corrective maintenance 11 151 182 ...
Page 185: ......