2
、
FRAME & ENGINE COMPONENT
15
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1250104-006097 GB16674M6×12 (chromed/HH)
3
2
1274100-057095
Flanging bushing φ6.2×φ8.4×3.5
+
φ14×1.5
4
3
1244100-052000
Buffer rubber of flanging bushing (φ8.5×φ14×1)
4
4
1224300-021000 ZT350-VX rear shock absorber link baffle
1
5
1251112-001093 M6×16 Hexagon flange bolts (color Zinc)
1
6
1251100-061093 M6×22 Hex flang bolt thread level 8.8 (color Zinc)
1
PROCEDURE:
●
Preparation steps
The seat cushion, fuel tank, side cover, lower fairling, muffler, bumper, etc. need to be removed first.
●
Link baffle assembly
After holding the baffle plate, use an 8# sleeve to remove 3 bolts
⑴
and 1 bolt
⑸
respectively, and remove the bushing
⑵
and buffer rubber
⑶
. Remove the connecting rod stopper
⑷
.
●
Disassemble the main pump U-joint of the disc brake
Straighten the cotter pin
①
and remove it, remove the spacer
②
and then remove the pin
③
.
●
Shift lever spline rocker arm
Use an 8# socket or a torx wrench to remove the bolt
⑹
, and pull out the rocker arm
⑹
.
CAUTION
:
●
Use the appropriate tools to support the vehicle to prevent accidents caused by the dumping of the vehicle during the
disassembly process; single operation is strictly prohibited.
Fig.2 FRAME&ENGINE
FRAME&ENGINE 1
Содержание ZT350-V1
Страница 1: ...2022 08 02 Service manual ZT350 VX EURO V...