195
/
218
c. Remove the two M6x14 shaft shoulder bolts on the left
and right sides of the front clay plate using the 4# hex socket;
Then remove one M6x30 bolt with the 5# hex socket and
take out the gasket.
d. Press both sides of the front clay tablet according to the
small arrows and push the bulge at the arrows inward. Then
move the front clay tablet upwards to the appropriate
position and pull it out in the direction of the large arrows.
2. Remove the left and right front shock absorbers
a. Open the lid of both storage boxes. Remove twoM6x14
shaft shoulder bolts above the right storage box with 4# hex,
one M6×16 bolt below it and one expansion. Pull the storage
box cover assembly out for a certain distance, and then pull
out the inductive antenna plug on the back of the arrow.
Remove the left storage box assembly in the same way, and
unplug the USB charging cable.
b. Turn the direction to the far left and use the 6# hex to
remove the M8x35 bolt. In the same way, turn the direction
to the far right and remove the bolt. Use a flat-head
screwdriver to pry open the gap on the upper connection
board.
c. Use a 6# hex to remove the four bolts of the M8x35, pry
open the gaps in the lower connection plate with a flat-head
screwdriver, and remove the left front shock absorber and
the right front shock absorber.
3. Reinstall the shock absorber, front fender, front
wheel and other components
a. Use a flat-head screwdriver to pry open a gap on the
connection plate and insert corresponding shock absorber.
b. Use a flat-head screwdriver to pry open a gap in the
upper connection plate and insert the corresponding shock
absorber into the gap. Ensure that the upper end face of the
shock absorber is flush with the upper end face of the upper
connection plate. Remove the flat-head screwdriver after
installing the shock absorber in place. Screw in M8x35 bolts
and tighten with 6# hex. Torque: 25N.m(2.6kg f.m,18 lbf.ft).
c. Install the two M8x35 bolts to lower connection plate
and install the other shock absorber in the same way.
d. Pick up the front wheel, install the bushing, align the
mounting holes between the two shock absorbations, Pierce
the front axle, use 17# hex to tighten the front axle, torque
force: 50N.m (5. 1kgf.m, 37 lbf.ft).If one of the shock
absorbers is not installed in place, the front axle will not be
Содержание ZT125-M 2022
Страница 1: ...1 218 ZT125 310 350T M Maintenance Manual 2022 11 25...
Страница 111: ...111 218 l So far the adjustment operation of the valve clearance is completed...
Страница 138: ...138 218 Electrical schematic diagram of EFI system...
Страница 182: ...182 218 Exploded view of front fork components M125 310 Directional exploded view...
Страница 183: ...183 218 M350 Directional exploded view...
Страница 184: ...184 218 Front fork exploded view M125 310 The M125 are similar to the M310 taking the M310 as an example...
Страница 185: ...185 218 M350...
Страница 186: ...186 218 Exploded view of lower link board M125 310 The M125 are similar to the M310 taking the M310 as an example...
Страница 187: ...187 218 M350...
Страница 198: ...198 218 difference is that the M350 has one less adjusting nut and one more step to remove the connecting plate...