13 / 218
1. Vehicle information
Know Before Service
1. Use good quality tools, or special tools and fixtures designed by our company. The use of inferior tools may cause damage to
parts, peeling of plating, improper assembly, etc.
2. The O-rings, paper gaskets, copper gaskets, and component sealing rings used for sealing must be replaced before assembling.
3. Fasteners with torque requirements need to use a torque wrench to check the torque; if the torque is not required, refer to
the general torque value recommended by general fasteners.
4. Clean up before assembly; after assembly, check whether the assembly is correct and in place.
5. The vehicle should be parked balanced and pay attention to safety during disassembly and assembly. Including but not limited
to the use of electric tools, hand tools, pneumatic tools, hydraulic tools, handling; prevent contact with skin, eyes, burns, etc.
6. The replaced oils, liquids, batteries, etc. must be recycled and handed over to qualified institutions for disposal; it is forbidden
to dump them at will to pollute the environment or water sources.
7. Swallowing or inhaling coolant, brake fluid, etc. will cause certain harm to the human body. Any exposed skin such as hands
and face should be cleaned thoroughly after each addition. If swallowed by mistake, immediately contact the poison control
center or hospital; if inhaled, please immediately go to a ventilated environment. If it accidentally splashes into the eyes,
immediately rinse the eyes with a large amount of running water and seek medical advice or consultation in time. Keep away
from children and pets.
8 M310 and M125 vehicles produced before mid-August 2022 have the structure of M6×16 bolts + flanging b flanging
bushing buffer rubber, which can be replaced by M6×14 shoulder socket head cap bolts. Similar places in subsequent chapters
of this manual will not be repeated.
Only part of the basic requirements for matters needing attention, prevention of accidental injury, etc. can be listed; it is not
possible to list all situations in detail. Be vigilant during disassembly and assembly to prevent accidents.
Содержание ZT125-M 2022
Страница 1: ...1 218 ZT125 310 350T M Maintenance Manual 2022 11 25...
Страница 111: ...111 218 l So far the adjustment operation of the valve clearance is completed...
Страница 138: ...138 218 Electrical schematic diagram of EFI system...
Страница 182: ...182 218 Exploded view of front fork components M125 310 Directional exploded view...
Страница 183: ...183 218 M350 Directional exploded view...
Страница 184: ...184 218 Front fork exploded view M125 310 The M125 are similar to the M310 taking the M310 as an example...
Страница 185: ...185 218 M350...
Страница 186: ...186 218 Exploded view of lower link board M125 310 The M125 are similar to the M310 taking the M310 as an example...
Страница 187: ...187 218 M350...
Страница 198: ...198 218 difference is that the M350 has one less adjusting nut and one more step to remove the connecting plate...