![background image](http://html1.mh-extra.com/html/zippkits/vbox-2013-edition-deep-vee-sport-crackerbox/vbox-2013-edition-deep-vee-sport-crackerbox_building-instructions_3812149020.webp)
20
Boat flipped over and off of jig.
Installing spines. Hole goes forward.
Dowel doublers in place.
Trim the excess bottom and side sheeting flush.
Finish with an 80 grit sanding block.
Don’t spend too much time where the side
sheeting meets the top, as we will come back to
this area later.
Get the two spines. Push the center slot of the
spines into bulkhead 2. Check the fit; it should
be flush with the top of the bulkhead.
The spines go from bulkheads 1 to 3.
The hole in the spines should face forward.
Glue the two dowel doublers in place on the left
side of the hull. One on the front of bulkhead 3
and one on the rear of bulkhead 4.
These give more gluing surface for the deck
support dowel. This dowel protects the deck
when you pick the boat up.
We supply two sets of these doublers. You
should put them on both sides. If you later want
to add another ½ inch dowel (not included) to
the other side, the boat will be ready for it.
Содержание VBox 2013 Edition Deep Vee Sport Crackerbox
Страница 6: ...6...