![Zippkits VBox 2013 Edition Deep Vee Sport Crackerbox Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/zippkits/vbox-2013-edition-deep-vee-sport-crackerbox/vbox-2013-edition-deep-vee-sport-crackerbox_building-instructions_3812149012.webp)
12
Deck chines meet at nose.
Install chines following angle of bulkhead.
Lower chines meet at nose.
When you are sure the joint is secure, glue in
the bottom chines.
They are done the same way, but the chine
matches the bottom angle on all but the forward
bulkhead 1. The chine will have to twist to
accomplish this. It will lay flat (with relation to
the bottom angle) on bulkheads 5, 4 and 3.
At bulkhead 2, you can start the twist so that it
meets the keel at the proper angle.
Be sure that the chines are glued in so that
they match the angle of the boat bottom.
Bulkhead 1 is the only one where the chine
does not match the angle of the bottom.
Note how bottom chine matches bottom angle
until BH 2.
When that is secure, put some glue in the area
where all of the chines meet at the nose, to give
it a little extra strength.
Time for another break. Give your beautiful boat
skeleton at least 20 minutes to cure.
Содержание VBox 2013 Edition Deep Vee Sport Crackerbox
Страница 6: ...6...