9
×
Send the signed confirmation of receipt to Zfx GmbH.
If the product is damaged when there was no detectable damage to the packaging on delivery,
proceed as follows:
×
Report the damage without delay (by no later than the 7th day) to the shipping company.
×
Report the damage to Zfx GmbH.
×
Do not make changes to the product or packaging.
×
Do not use damaged components.
×
Under no circumstances, return the product to Zfx GmbH without prior agreement.
×
Send the signed confirmation of receipt to Zfx GmbH.
NOTE
If the recipient fails to comply with one of the above conditions, then the damage shall be deemed to have occurred
after delivery (in accordance with ADSp. Art. 28 / CMR law, Chapter 5, Art. 30).
1.5 Transportation and storage in the packaging
1.5.1 During transportation and storage up to commissioning
The following symbols for transportation and storage must be observed:
1.5.2 Storage before commissioning
Before commissioning: After shipping, the system must be left in the packaging for sufficient time for acclimatization
so that all components reach the specified operating conditions (15°C to 30°C). If there is a risk of dew formation, the period
must be extended accordingly to give the moisture opportunity to escape.
It is recommended to wait for a least 8 hours before opening the packaging.
CAUTION
As result of large temperature changes or high humidity, condensation may form and lead to a short circuit.
The sensor unit can also go out of adjustment.
Keep upright;
arrows point upwards!
Do not stack!
Keep dry!
Protect against
shock!
Содержание Zfx EvolutionNEXT
Страница 1: ...Zfx EvolutionNEXT Manual A COMPANY OF ...
Страница 7: ...7 ...
Страница 13: ...13 ...
Страница 45: ...45 ...
Страница 65: ...65 ...