
40 / 58
Identificazione: MD-AL-GI-00
Rev. 4.0 del 31.01.18 - Applicazione: GID
Manual of 11/06/2019 Rev. 1.8 “User Manual for 3000SP storage inverter”
↓
Press “down”
81>.S1 50.5Hz 100ms
↓
Press “down”
81>.S1 49.9Hz 103ms
↓
Press “down”
81>.S2 51.5Hz 100ms
↓
Press “down”
81>.S2 49.9Hz 107ms
↓
Press “down”
81<.S1 49.5Hz 100ms
↓
Press “down”
81<.S1 50.0Hz 105ms
↓
Press “down”
81<.S2 47.5Hz 100ms
↓
Press “down”
81<.S2 50.1Hz 107ms
2)
STD Self-Test
Select “2. STD Self-test” and press “OK” to start the standard self-test. The test procedure is the
same as the fast self-test with the difference that the waiting times are longer (about 45
minutes) due to the 300-second wait between one test and the next.
3)
Set PF time
Select “3. Set PF time” and press “OK” to enter the menu for setting this parameter. The display
will show the following:
*.*** represents the time to be set in seconds. Use the “Up” and “Down” keys to set the desired
value. Press “OK” and wait for “OK” to appear on the display.
This function is required by various standards for grid-connected inverters, and allows the
active power to be changed based on the grid frequency according to the requirements of the
local standards.
This option allows setting the delay time (expressed in seconds) with which the change in P
power occurs.
Set
:
*.*** s