4-47
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
ENG
5. Install:
9
Crankcase cover (right)
1
NOTE:
Mesh the governor gear
2
with the governor
drive gear
3
and the impeller shaft gear
4
with
the primary drive gear
5
.
4. Install:
9
Dowel pin
1
9
Gasket [crankcase cover (right)]
2
3. Tighten:
9
Bolt (primary drive gear)
1
NOTE:
Place an aluminum plate
a
between the teeth of
the primary drive gear
2
and driven gear
3
.
EC4C5531
Primary drive gear
1. Install:
9
Thrust plate
1
9
Primary drive gear
2
9
Governor drive gear
3
9
Plain washer
4
9
Bolt (primary drive gear)
5
NOTE:
9
Install the plain washer with its chamfered side
a
toward you.
9
Temporarily tighten the bolt at this point.
2. Install:
9
Primary driven gear
Refer to “CLUTCH AND PRIMARY DRI-
VEN GEAR” section.
55 Nm (5.5 m•kg, 40 ft•lb)
1P8-9-31-4B 4/29/05 3:08 PM Page 40
Содержание YZ250(V)
Страница 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Страница 594: ...TUN MEMO...