2-15
CABLE ROUTING DIAGRAM
SPEC
1
Ignition coil lead
2
Clamp
3
CDI magneto lead
4
Neutral switch lead (except for
USA and CDN)
5
Radiator breather hose
6
Connector cover
A
Clamp the ignition coil lead to
the frame at its locating tape.
Clamp it in front of the radiator
fitting boss.
B
Clamp the CDI magneto lead to
the frame at its locating tape.
Clamp it at the rear of the radia-
tor fitting boss.
C
Do not allow the neutral switch
lead to slacken except over the
radiator hose. (except for USA
and CDN)
D
Pass the neutral switch lead
through the holder. (except for
USA and CDN)
E
Pass the radiator breather hose
outside the engine bracket and
inside the down tube. Then
pass the radiator breather hose
inside the CDI magneto lead.
F
Clamp the CDI magneto lead,
radiator breather hose, YPVS
breather hose and neutral
switch lead (except for USA and
CDN) to the frame.
G
Clamp the radiator breather
hose, CDI magneto lead and
neutral switch lead (except for
USA and CDN) to the frame.
H
Pass the CDI magneto lead,
radiator breather hose and neu-
tral switch lead (except for USA
and CDN) in front of the radiator
hose. Then pass the radiator
breather hose inside the CDI
magneto lead.
I
Pass the radiator breather hose
and ignition coil lead between
the frame and the radiator (left).
J
Locate the clamp ends in the
arrowed range.
K
Bring the connector cover into
contact with the coupler.
1P8-9-31-2 5/19/05 10:30 AM Page 56
Содержание YZ250(V)
Страница 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Страница 594: ...TUN MEMO...