4-48
KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE GEAR
ENG
8. Install:
9
Shift pedal
1
9
Bolt (shift pedal)
2
NOTE:
Install the shift pedal so that the top of the shift
pedal outer diameter
a
is highest without
exceeding the line
b
connecting the center of
the shift shaft and bottom of the screw
[crankcase cover (left)]
3
.
7. Install:
9
Kick starter
1
9
Plain washer
2
9
Bolt (kick starter)
3
NOTE:
Install the kick starter closest to but not contact-
ing the clutch cover mounting boss
a
.
6. Install:
9
Bolt [crankcase cover (right)]
1
NOTE:
Tighten the bolts in stage, using a crisscross
pattern.
30 Nm (3.0 m•kg, 22 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
1P8-9-31-4B 4/29/05 3:08 PM Page 42
Содержание YZ250(V)
Страница 78: ...2 11 MAINTENANCE SPECIFICATIONS SPEC MEMO...
Страница 594: ...TUN MEMO...