BRKT
7-25
6S35H11
Bracket unit
10. Loosen the pipe joints
3
, and then
remove the pipe joint
b
.
11. Install the special service tools as shown.
NOTE:
Put the PTT unit in the drain pan.
12. Connect the PTT motor leads to the bat-
tery terminals to extend the trim rams,
and then measure the hydraulic pres-
sure.
13. Reverse the PTT motor leads between
the battery terminals to fully retract the
rams.
14. Remove the special service tool.
15. Install the pipe joints, and then tightening
them to the specified torque.
16. After measuring the hydraulic pressure,
connect the PTT motor leads to the bat-
tery terminals to fully extend the trim and
tilt rams.
6S370080
3
b
2
6S370100
6S370110
6S370090
PTT oil pressure gauge
assembly
2
: 90890-06580
Hydraulic pressure (up):
11.3 – 13.3 MPa (113 – 133 kgf/cm
2
)
Pipe joint:
15 N·m (1.5 kgf·m, 11.1 ft·lb)
6S35H11_072 05.9.9 0:42 Page 26
Содержание 250GETO
Страница 1: ...L250G SERVICE MANUAL 6S3 28197 5H 116 250G 250G L250G ...
Страница 4: ......
Страница 135: ... MEMO 9 8 7 6 5 4 3 2 1 6S35H11 5 48 ...
Страница 160: ...LOWR 6 23 6S35H11 Lower unit Shimming regular rotation model T3 M3 M4 M2 6S36050EA T2 T1 M1 F R P ...
Страница 201: ...6S35H11 6 64 9 8 7 6 5 4 3 2 1 MEMO ...
Страница 291: ......
Страница 292: ...YAMAHA MOTOR CO LTD Printed in Japan Aug 2005 1 4 1 E_2 Printed on recycled paper 250G L250G ...