1125100
WPC 1000 User Manual
2-14
Installation
Making Wiring Connections
To wire a pre-wired Operator Station, perform the following steps:
1.
Punch a hole in the Operator Station enclosure for conduit or sealtight.
2.
Connect the conduit or sealtight to the hole; then open the Operator Station box.
3.
Run the Operator Station cable in the sealtight.
4.
Plug the connector end of the cable into the Operator Station.
Figure 2-7. Wiring Steps to Modify Operator Station for WPC 1000
B
Free the black wire.
Disconnect the pair of
white-and-red wires.
C
Connect the black wire
where you just
disconnected the pair
of white-and-red wires.
Bend the white-and-red
wires back on themselves.
Ty-wrap them in place.
Insulate connector lug
with electrical tape.
D
E
Black wire with
connector lug,
not connected
to anything
Pair of white-and-red
wires connected to
one terminal
of the mute lamp
Examine the mute
lamp wiring as it
came from the factory.
NOTE:
Orientation of connections
may be different.
A
Содержание WPC 1000
Страница 17: ...1125100 WPC 1000 User Manual xii Table of Contents ...
Страница 69: ...1125100 WPC 1000 User Manual 2 42 Installation Figure 2 22 One hand Control Switch Mounting Dimensions ...
Страница 99: ...1125100 WPC 1000 User Manual 2 72 Installation ...
Страница 207: ...1125100 WPC 1000 User Manual A 18 Extracts from OSHA and ANSI ...
Страница 217: ...1125100 WPC 1000 User Manual G 6 Glossary ...
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 227: ......
Страница 228: ......
Страница 229: ......
Страница 230: ......
Страница 231: ......
Страница 232: ......
Страница 233: ......
Страница 234: ......
Страница 235: ......