1125100
WPC 1000 User Manual
3-54
Initialization, Setup, and Checkout
7.
You can now bar the press, using a spring-loaded turnover bar.
8.
Go to the next applicable test.
Checking Operation of the User Inputs
This test verifies that any user inputs you have connected to auxiliary press functions are
wired and operating correctly. If you have not wired any user inputs, go to the next section.
To perform this test, do the following:
1.
Run the press. Actuate one of the user inputs.
•
If the press stops and the appropriate fault code displays, the input is wired and
operating properly. Repeat the test for the other user inputs. When you have checked
all of the inputs, go to the next step.
•
If the press does not stop and/or the appropriate fault code does not display, check the
wiring of that input and rerun the test. If the press still does not stop and/or the correct
fault code does not display, call Wintriss Tech. Support.
2.
You have completed the Final Checkout tests. Proceed to Chapter 4.
As you bar the press, WPC 1000 monitors the speed of the crank. If you bar the press too
quickly, the DSV de-energizes and an F26 fault code displays, stopping the press.
NOTICE
Содержание WPC 1000
Страница 17: ...1125100 WPC 1000 User Manual xii Table of Contents ...
Страница 69: ...1125100 WPC 1000 User Manual 2 42 Installation Figure 2 22 One hand Control Switch Mounting Dimensions ...
Страница 99: ...1125100 WPC 1000 User Manual 2 72 Installation ...
Страница 207: ...1125100 WPC 1000 User Manual A 18 Extracts from OSHA and ANSI ...
Страница 217: ...1125100 WPC 1000 User Manual G 6 Glossary ...
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 227: ......
Страница 228: ......
Страница 229: ......
Страница 230: ......
Страница 231: ......
Страница 232: ......
Страница 233: ......
Страница 234: ......
Страница 235: ......