USER GUIDE |
EAGLE TWO+
Version: 3.3
83
CHAPTER 10
Calibration Procedures
Calibrating the EAGLE TWO+
For normal running program requires data constants, which are dependent on the hardware. All this
data is stored in NV Ram after calibration process is completed. Calibration is recommended after:
Changing CPU or RF main board.
Every six months.
Steps and description:
Step 1 - PREM Calibration
Step 2 - Close loop current Calibration Step 3 - Close loop voltage Calibration Step 4 -
Close loop power Calibration Step 5 - Open loop power Calibration Step 6 - Open loop
voltage Calibration
Preparing for Calibration:
Equipments:
Bipolar footswitch and Monopolar footswitch.
Small test cables with banana plugs.
PREM plug modified.
Resistor substitution box.
Oscilloscope.
True RMS current meter.
Entering Calibration Mode:
To enter in calibration mode, switch ON EAGLE TWO+follow this procedure given below:
1.
Press „Setup‟ option.
2. Press the Calibration touch key to enter calibration mode.
3. Contact manufacturer for the authentication password.
After successful authentication machine will successfully enter in a calibration mode. You can enter
in any mode simply by touching on the desired mode.
Exiting Calibration Mode:
One can exit calibration procedure at any time by pressing back keys on the screen. Or just restart the
generator by turning it off and on.
(For Calibration follow the guide given below on the next page).
Содержание EAGLE TWO PLUS
Страница 1: ...EAGLE TWO PLUS INSTRUCTION SERVICE MANUAL ...
Страница 38: ...USER GUIDE EAGLE TWO Version 3 3 37 ...
Страница 39: ...USER GUIDE EAGLE TWO Version 3 3 38 ...
Страница 40: ...USER GUIDE EAGLE TWO Version 3 3 39 ...
Страница 49: ...USER GUIDE EAGLE TWO Version 3 3 48 2 Electrosurgery Mode in Eagle 2 Accessories connection in ESU Mode ...
Страница 56: ...USER GUIDE EAGLE TWO Version 3 3 Whittemore Enterprises Inc 55 STEP 5 STEP 8 STEP 6 STEP 7 ...