![Westeel EasyDry Wide-Corr Centurion 24 Series Скачать руководство пользователя страница 121](http://html.mh-extra.com/html/westeel/easydry-wide-corr-centurion-24-series/easydry-wide-corr-centurion-24-series_original-instructions-manual_959902121.webp)
250050 R1
121
d. Push the nut and spring above the mark.
e. Clamp the cable at the mark and trim.
f. Insert a nut into the spring and position the spring on the top of the clamp.
g. Position a second clamp approximately the diameter of the roof cap up the cable (36"), tightening it
firmly enough to hold the cap in the open position.
h. Adjust as required so that the cap is fully open in the open position.
Figure 91.
Cable and Handle Detail
1
22
11
3
10
4
5
23
21
15
2
7
9
12
14
ROPE ARM
OVERLAP DETAIL
1.375
EYE BOLT
1
OPENING
DIRECTION
CL
CL
OFFSET
BACK
EYEBOLT
3
PIVOT ARM
BRACKET
P/N 235337
BACK
FRONT
SLIDE ROD
P/N 235339
2
26
25
10
16
19
16
10 24
10
12"
20
18
17
6
16
19
16
1
27
NOTE: Double nut required on retainer bolt.
1.
IMPORTANT: Eye bolt should be adjusted to 1.375” from the bottom
of the lid to the center of the eye bolt.
2.
IMPORTANT: Adjust Pivot Arm Bracket to the extreme back position.
3.
After assembly is complete, the lid will seat offset towards the back.
4.
Overlap Rope Arms and bolt together using 5/16” x 2” bolts.
EASYDRY® WIDE-CORR CENTURION® GRAIN BIN – GRAIN BIN DRYER