Figure 75.
Peak Ring Installation
WALLSHEETS
PEAK RING
(suspended)
CENTER POST
HEIGHT "H"
FROM TABLE
Step #3: Add the supplied bulb gasket
around the top of the peak ring and
foam-closure-gasket around the
center section as shown (Detail 1).
Step #4: A tier of wall sheets (or possibly two tiers if
tier Uprights are included) is required
t
t the roof. Start assembling the wall sheets.
Note: Consult the “Hardware
Usage” section in this manual for the proper hardware usage throug
the bin.
When one tier is complete att
wall sheets. Do not allow a joint
be positioned directly over the Grain
cutout in one of the top wall sheets.
Ensure that the joint between top-ring
-angle sections is at least 2 or 3 wall
sheet holes away from the Grain
cutout. Follow guidelines concerning
tank roundness tolerances as laid out
on the Bin Roundness page in this
manual.
Step #5: Suspend the peak-ring assembly to the top of the center post. Refer to the "bin-
roundness-table" for correct heights and peak-ring sizes (Detail 2).
Step #6: Begin laying out roof-panels by attaching
the narrow end to the peak-ring and the wide
end to the top of the top-ring-angle. It is
recommended that you first attach four roof-
panels at the quarter points of the bin; this will
stabilize and support the peak-ring for the rest of
the install (Detail 3). Ensure that the gap
between the roof-panel and the peak-ring is
sealed by foam closure. (Detail 1). Note that the
center hole in the roof panels aligns with round
holes in the top ring angle.
GASKET
PEAK RING
PEAK FOAM
CLOSURE
PEAK RING
PEAK RING
BULB GASKET
FIRST
ROOF PANELS
IN 4 QUADRANTS
Detail 1
Detail 3
TIP
:
The narrow end of the roof panels gets pushed into the foam closure. Once this occurs there is
little room for adjustment at the top end as the roof panel is embedded in the foam. Sometimes
the roof panels get “flattened” slightly from bundling, shipping and handling. It is relatively easy to
push the ribs together slightly but this should occur before the panel is seated in the foam.
Monitor the alignment of mating roof panels with the underlying holes in the peak ring and make
adjustments, if necessary, before anchoring the roof panel into the foam.
IMPORTANT: Avoid shortages.
Consult “Hardware Usage”
table for proper hardware
usage for all bin connections.
Page C2
Note
EasyDry® Plenum not shown for drawing simplicity.
Table 11.
Roof Peak Ring Height (2 and 3 tier)
Nominal Bin
Diameter
Top of Peak Ring Height "H" with 2
tiers of wall sheets
Top of Peak Ring Height "H" with 3
tiers of wall sheets
(ft)
(ft in)
(m)
(ft in)
(m)
24
14'0-7/16"
4.279
17'8-7/16"
5.396
27
14'10-3/4"
4.54
18'6-3/4"
5.658
30
15'3-5/8"
4.664
18'11-5/8"
5.782
36
17'0-1/4"
5.188
20'8-1/4"
6.306
Install the Roof Sheets
1. Attach roof sheets with the narrow end to the peak ring and the wide end to the top ring angle.
2. Initially, attach four roof panels at the quarter points of the bin. (See
.)
This will stabilize and support the peak ring for the rest of the install.
EASYDRY® WIDE-CORR CENTURION® GRAIN BIN – GRAIN BIN DRYER