250050 R1
111
Figure 77.
Eave Shim Installation Detail
TOP RING
ANGLE
5/16
” x 1
-1/4
”
HEX BOLT
ROOF
SHEET
5/16
”
HEX NUT
EAVE SHIM
(Wall sheets not shown for clarity purposes)
4. Make sure that the gap between the roof panel and the peak-ring is sealed by the foam closure.
5. Make sure the center hole in the roof panels aligns with round holes in the top ring angle.
6. Install the remaining roof panels, working in a counter clockwise direction:
a. Attach the center roof panel hole first.
b. Use two bolts at each roof panel to peak ring connection.
c. Fill in every bolt hole in roof panel ribs with rubber washered bolts to the outside and nuts on the
underside.
d. Make sure the left roof rib overlaps the right rib of the preceding panel. (See Detail 2 in
.)
Figure 78.
Roof Rib Orientation & Roof Ring Bracket Assembly
Figure
7.
Roof
Rib
Orientation
&
Roof
Ring
Bracket
Assembly
Detail
1
Detail
2
EASYDRY® WIDE-CORR CENTURION® GRAIN BIN – GRAIN BIN DRYER